Invoice Koi Free generator

Invoicing for fencing contractors

Invoice Koi is an invoice app for fencing contractors, showing the panels, the posts and the gates against the labour so the money already spent is visible.

Make an invoice free
Get it on Google Play

The iPhone app is coming to the App Store.

An illustration of a fence post, a post level, a bag of postcrete, a claw hammer and a roll of wire, with a koi swimming among them.

A fencing job is mostly materials, and materials are mostly paid for before the work starts. That is the whole problem with the paperwork: the customer is looking at a total and thinking about labour, while the money that has already left your account is sitting in fourteen panels stacked on their lawn.

01On the document

What fencing contractors
put on an invoice.

Save these items with your own rates. Tap to add them to an invoice, with the unit, price and totals filled in.

LineUnit
Fence panel, supplied and fittedeach
Concrete post, supplied and seteach
Gravel board, supplied and fittedeach
Gate, supplied and hungeach
Old fence removal and disposaljob
Groundworks and digginghrs
Site visit and quotationeach

Set your own prices. The app's starter rates are placeholders. To bill one job today with nothing installed, the free fencing contractor invoice template opens in your browser with these lines on it.

A job, grouped Subtotals per section
STRIP OUT
Old fence removal and disposal£220
Subtotal£220
MATERIALS
Close board panels, 14£700
Concrete posts and gravel boards, 15£525
Gate, supplied£160
Subtotal£1,385
INSTALL
Installation labour, 2 days£640
Subtotal£640
Total£2,245
Grouped line items work on all nine templates.
A photograph of a fencing contractor setting a post into a freshly dug hole along a garden boundary, panels stacked on the grass.
Price book
Fence panel, supplied and fittedeach
Concrete post, supplied and seteach
Gravel board, supplied and fittedeach
One tap puts the line on the invoice.
This job, grouped
STRIP OUT£220
MATERIALS£1,385
INSTALL£640
Total£2,245
No signal needed. It is written here.
02Why fencing contractors use it

Three things that
save the evening.

A deposit that covers the timber

Quote the job, take a deposit against it, and the invoice shows what was paid up front and what is left. The materials are bought with their money rather than yours.

Materials and labour, told apart

Group them with their own subtotals so a customer comparing your price with a cheaper one can see that the difference is in the posts rather than in the day.

The estimate becomes the invoice

What was quoted converts with the lines, the client and your terms intact, so the document at the end matches the one they said yes to in March.

03 · Questions

Asked by fencing contractors.

How do I take a deposit for materials before starting?

Record the deposit against the document. The invoice then shows the full price, what has been paid and the balance outstanding.

Can I invoice for a fence in metres rather than per panel?

Yes. A price-book line carries its own unit, so you can bill per panel, per metre or per day, whichever way you priced it.

What if the ground turns out to be concrete?

Add the extra digging as its own line before you send the invoice. It reads as work that happened rather than as a price that changed.

Weighing up apps? Invoice Koi vs Jobber and Invoice Koi vs Tofu set the features side by side, including where they win. Or see all 12 comparisons.

Make an invoice free
Get it on Google Play

The iPhone app is coming to the App Store.

Already have it? Open it